Stockpile quantities, cut & fill analysis, reduced dig quantifying and analysis. Moving material can be an expensive business if estimated or calculated incorrectly, whether it be cart of site, importing quantities of material for fill or construction, or moving it from A to B within a project. utilizing our latest equipment in drones, GPS and total stations, we can negate any risks of assumption or guesswork when quantifying material.

Our data collected out in the field is then processed using the latest surveying processing software to create models, simple surfaces, and most importantly accurate quantities for our clients particular operation.

Dive into our accomplished projects

Example cut and fill model

This is a basic example model of the type of cut and fill modelling TDM Engineering & Surveying can provide.

It demonstrates commencement ground levels projected to to reduced dig design levels.

The model drawing shows the depth of cut and where, along with the total volume of cut, area of cut and average cut depth to come off the project as demonstrated in the table at the bottom.

These models can be adapted to suit the 14no. covered cycle clients needs and requirements and can be a lot more in depth depending on the clients wishes.

Cut and fill volume - proposed FFL surface projected to current levels
Volume Value Area Value Avge Depth Value
Cut 701.44 Cut 1350.80 Cut 0.519
Fill 125.19 Fill 324.16 Fill 0.386
Balance 576.24 Combined 1674.96
Null 0.00
image